|
 |
| |
In 2001, Petersen Inc. received the NRC Quality Certificate (NRC Subpart H of 10 CFR 71)
and has since completed work for the companies listed below, as well as others. In 2002, Petersen Inc.
also received a contract to build Standard Waste Boxes and Ten Drum Over Packs. This agreement allows
fabrication, storage, and shipment of SWB’s and TDOP’s to any D.O.E. customer purchasing them through
Washington TRU-Solutions. In 2004 Petersen Inc. was awarded a contract with Bechtel National Inc. to
fabricate the 2 High Level Waste Melters and 2 Low Activity Waste Melters for the Richland, WA, River
Protection Project (RPP). These Melters are the heart of the RPP project and Petersen Inc. was chosen
to fabricate all four of these Melters because of our outstanding Quality program and our tremendous
capabilities and capacities, as well as the high quality product Petersen Inc. produces.
|
|
| |
|
| |
|
PETERSEN INC. MANUFACTURED CONTAINERS: |
-
Ten Drum Overpack (TDOP)
-
Standard Waste Box (SWB)
-
IP-2 Type 1 Cargo Container (20' and 23')
-
DOT-Strong Tight Package (Open Top - Steel Dry Container)
-
Semi-Bulk Container
|
| |
|
|
| |
 |
|
|